• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2019 - Feb 2020
  • Estimated project cost $132,734
  • Australian Government contribution $77,031
  • Local Council/Shire Balranald Shire Council
  • State NSW

Project description

Existing Single Grids are deteriorating due to age and an increase of heavy vehicles. Grids are beginning to show signs of wear and tear, and are starting to cause safety problems. The Formation of the road has also deteriorated for the same reason.

To remove three old single grids and replace with new double grids. New grids will be placed on compacted gravel and the approaches will be sealed to a length of 70m. To form, reshape and build the road up to natural surface with natural material. This will include grading along the sides of the road to form table drains for drainage flow.

Total cost of proposed project is $132,734

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.