• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2021 - Apr 2021
  • Estimated project cost $176,000
  • Australian Government contribution $112,416
  • Local Council/Shire City of Canada Bay Council
  • State NSW

Project description

The existing Road pavement has deteriorated over the time and is due for renewal. Damaged kerb & gutter needs replacement to avoid further deterioration or failure. Council has identified a number of driveways that will require modification to address scraping or bottoming issue.

An Engineering survey has been completed and the detailed design is currently underway. New pavement is to be constructed to service a high volume of vehicles tending to the local school. Road pavement works will improve riding quality and reduce the deterioration of pavement structure thus improving longevity of the asset. Existing kerb & gutter and layback will be reconstructed.

Total cost of proposed project is $176,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.