• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2020 - Dec 2020
  • Estimated project cost $1,200,000
  • Australian Government contribution $785,619
  • Local Council/Shire Shire of Meekatharra
  • State WA

Project description

The gravel road has become corrugated and is water worn due to heavy traffic and the environment. The four floodways in this section of road are significantly damaged from rain events. Sealing this section will provide a safe dust free rural road and overtaking section in a heavy vehicle usage area.

Reconstruct road to 10 m wide. Improve drainage and floodways. Apply a 7.2 m wide bitumen seal over a length of 6 kms

Total cost of proposed project is $1,200,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.