• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2020 - Jun 2021
  • Estimated project cost $452,019
  • Australian Government contribution $452,019
  • Local Council/Shire Shire of Upper Gascoyne
  • State WA

Project description

This section of road has lost formation and the existing material used to sheet has unravelled and become hazardous. The running surface is approximately 300 millimetres lower than the surrounding landscape causing water to flow down the road instead of the drain lines. The shoulders are overgrown and preventing access for the graders to properly maintain the batters.

Clear the shoulders of vegetation and import good quality gravel to lift and re-sheet running surface with 3% crown formation.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.