• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2021 - Jun 2021
  • Estimated project cost $332,503
  • Australian Government contribution $332,503
  • Local Council/Shire Townsville City Council
  • State QLD

Project description

This is a populated and heavy trafficked street with aged and deteriorated asphalt. There is moderate cracking throughout and moderate deformation in areas due to pavement saturation. There are minimal cross falls and the kerbs are showing signs of defects throughout.

Remove all existing kerbs and road pavements (full width), treat subgrade with lime stabilization (if required). Full road reconstruction including all kerb and channel.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.