• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jun 2021 - Jun 2021
  • Estimated project cost $178,068
  • Australian Government contribution $178,068
  • Local Council/Shire Townsville City Council
  • State QLD

Project description

The existing asphalt in this court is aged and deteriorated. There are multiple patches (some of which are failing again) along with some moderate deformation in areas. Moderate cracking is also evident throughout. The existing kerbs show cracking and rotation in areas.

Remove all existing kerbs and road pavements (full width), treat subgrade with lime stabilization (if required). Full road reconstruction including all kerb and channel. There will be some tree trimming required to allow for work operations in this street.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.