• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2020 - May 2022
  • Estimated project cost $493,061
  • Australian Government contribution $493,061
  • State NSW

Project description

Existing road is uneven with failures requiring reconstruction. Existing kerb and gutter is uneven with surface water pooling for extended periods of time due to poor drainage.

Reconstruct the road and shoulders on either side of Stewart Street including strengthening the existing sub-base through stabilisation and constructing a new base course pavement, then sealing the Street. Reconstruct the existing kerb and gutter and stormwater drainage along both sides of Stewart Street

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.