• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2020 - May 2021
  • Estimated project cost $237,772
  • Australian Government contribution $237,772
  • State NSW

Project description

Existing road shoulders are uneven with failures requiring reconstruction. Existing kerb and gutter is uneven with surface water pooling for extended periods of time

Reconstruct the road shoulder on either side of Russell Street including strengthening the existing sub-base through stabilisation and constructing a new base course pavement. Resealing the entire width of Russell Street, including the reconstructed shoulders and existing travel lanes. Reconstruct the existing kerb and gutter along both sides of Russell Street

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.