• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2021 - Jul 2021
  • Estimated project cost $57,579
  • Australian Government contribution $57,579
  • Local Council/Shire City of Lithgow Council
  • State NSW

Project description

The existing asphalt seal has reached the end of its useable life, primarily resulting in significant surface defects such as potholing. Roadside kerb and gutter is also cracking and lifting, requiring replacement.

Where defects are present, roadside concrete kerb and gutter will be replaced. The existing asphalt surface will be milled to a depth of 50mm and any underlying pavement defects repaired where they present. A 50mm AC14 asphalt seal will then be applied.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.