• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2021 - Mar 2022
  • Estimated project cost $275,926
  • Australian Government contribution $275,926
  • Local Council/Shire Shire of Shark Bay
  • State WA

Project description

Brockman Street bitumen seal has numerous longitudinal and crocodile cracking. kerbs are in an extremely poor condition with multipul cracks and defects. footpath is not suitable for purpose as it has a very poor and uneven surface condition and not wide enough for duel use purposes.

Remove footpath and kerbs. Profile existing seal. Reinstate kerbs and install dual use footpath. reseal along Brockman Street with asphalt from straight line kilometre 0.490 to Straight line kilometre 0.770

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.