• Funding program Roads to Recovery Program
  • Status Under construction
  • Transport mode Road
  • Expected start/finish Mar 2021 - May 2021
  • Estimated project cost $22,354
  • Australian Government contribution $29,154
  • Local Council/Shire Shire of Bridgetown Greenbushes
  • State WA

Project description

Unsealed surface and lack of drainage infrastructure is causing road storm water and loose material to flow onto residential properties.

Asphalt seal of the north-south lane way to direct storm water into Ethel St drainage system. Install new sump and pipe to direct storm water from the east-west lane way into existing storm water system.

Total cost of proposed project is $62,530

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.