• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2020 - Jun 2021
  • Estimated project cost $53,896
  • Australian Government contribution $21,463
  • Local Council/Shire Cabonne Shire Council
  • State NSW

Project description

Degraded road surface. High maintenance costs for gravel resheeting and gravel grading. Frequent dust storms and erosion of top soil causes safety issues to motorists. Sharp bends. Section needs upgrade to improve sight distance.

Full seal of gravel road. Redefining drains with excavation and grade. Widening/ overlay 100mm, and stabilising road (if required) to 4 m formation with 3.5 m seal for 920 mts. Vegetation including tree removal and branch removal to improve sight distance on the road corridor.

Total cost of proposed project is $53,896

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.