• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2020 - Apr 2021
  • Estimated project cost $367,308
  • Australian Government contribution $262,758
  • State NSW

Project description

The existing road surface is affected by numerous potholes and pavement failures. It is old, brittle, and prone to cracking and development of potholes. The number of existing defects makes it very rough. Some sections of kerb and gutter are in poor condition. There are also deficiencies in stormwater drainage system.

The proposed work will include upgrade of stormwater drainage system, replacement of kerb and gutter and reconstruction of road pavement. Length = 260 m; Width = 6.4 m; Area = 1664 m2.

Total cost of proposed project is $367,308

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.