• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2021 - Jun 2021
  • Estimated project cost $460,000
  • Australian Government contribution $156,400
  • Local Council/Shire Barcoo Shire Council
  • State QLD

Project description

The existing single lane steel bridge requires significant maintenance works to remain in service and to avoid the potential of having to place a load limit on the structure. The specialist resources required to undertake bridge works are not readily available within the region, hence the reason for replacing the bridge with a concrete culvert that can be delivered using local resources.

Replacement of the existing bridge structure with concrete box culverts to provide a new, low maintenance asset that will provide for two lanes of traffic.

Total cost of proposed project is $460,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.