• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2021 - Jul 2022
  • Estimated project cost $300,000
  • Australian Government contribution $134,200
  • Local Council/Shire Barcoo Shire Council
  • State QLD

Project description

The existing steel culverts have corroded beyond repair and need to be replaced to avoid the potential of having to place a load limit on this road. The site is currently under sidetrack conditions.

Replacement of the existing culvert structure with concrete box culverts and associated scour protection works.

Total cost of proposed project is $300,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.