• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2021 - Apr 2021
  • Estimated project cost $68,219
  • Australian Government contribution $30,472
  • Local Council/Shire City of Port Phillip
  • State VIC

Project description

Deformed asphalt surface has been identified through road inspections. The pavement surface has deteriorated which may directly influence the riding quality and skid resistance. Resurfacing this road segment will improve the road performance and provide strength and riding quality.

40mm thick size 10 type N asphalt wearing course along 89 metre and width 11.4 metre (two sides each 5.7metre) Total asphalt area =1,015m2

Total cost of proposed project is $68,219

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.