• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2021 - Jun 2021
  • Estimated project cost $240,113
  • Australian Government contribution $120,113
  • State NSW

Project description

The existing road surface is affected by numerous cracks, other pavement defects and patches. The surface is old, brittle and prone to development of potholes.

The proposed work includes repair of existing pavement defects by heavy patching and resurfacing of the road with hot mix asphalt. Length = 325 m; Width = 10 m; Area = 3250 m2

Total cost of proposed project is $240,113

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.