• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2021 - Jun 2021
  • Estimated project cost $142,081
  • Australian Government contribution $142,081
  • State NSW

Project description

The existing road surface is affected by numerous cracks and structural pavement failures, especially at bus stop areas and around traffic islands. It is old and permeable, enabling water ingress into the pavement.

The proposed work includes reconstruction of affected pavement areas and resurfacing of the road with hot mix asphalt. Length = 180 m; Width = 10.2 m; Area = 1836 m2.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.