• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Nov 2020 - Dec 2020
  • Estimated project cost $91,555
  • Australian Government contribution $91,555
  • Local Council/Shire Balranald Shire Council
  • State NSW

Project description

Formation of road has deteriorated due to traffic. The road level is below natural surface and in a low lying area with poor drainage. The road becomes impassable in wet conditions. Roadside drainage is none existent causing deep scouring alongside of the road and certain places crossing the road. No subbase, no subgrade. Highly feeble.

To form, reshape and build the road above natural surface with natural material. This will include grading along the sides of the road to form table drains for drainage flow.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.