• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2021 - May 2021
  • Estimated project cost $197,918
  • Australian Government contribution $130,000
  • State NSW

Project description

The asphalt road surface is subsided, cracked and had failed in many places with rutting and pot holes on the road surface indicating subbase failure

To heavy patch areas between 50mm to 100mm in depth to repair the subgrade and subbase failure and overlay with 50mm thick asphalt concrete layer. Approximate area to be rehabilitated is 6,500 square metres with dimensions, 546m long x 11.9m wide

Total cost of proposed project is $197,918

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.