• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2021 - Jun 2023
  • Estimated project cost $1,553,411
  • Australian Government contribution $320,000
  • Local Council/Shire Lachlan Council
  • State NSW

Project description

Existing street is used as a heavy traffic route through a residential area past two schools. As part of the development of Maitland Street as a heavy traffic bypass Molong Street will be upgrade with traffic calming devices to discourage use by heavy traffic. The existing pavement has also reached the end of its economic life.

Replacement of kerb and gutter and installation of kerb blister and road humps to reduce traffic speeds. Installation of pedestrian refuges. Reconstruction and stabilization of road pavement with final sealing of road surface.

Total cost of proposed project is $1,553,411

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.