• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2021 - Jan 2022
  • Estimated project cost $510,000
  • Australian Government contribution $477,167
  • Local Council/Shire Hobsons Bay City Council
  • State VIC

Project description

Cracking has occurred at many locations along the street and the road pavement surface is breaking up. The pavement has also lost shape with significant failures and requires full reconstruction to address failures and loss of shape and safety risk. Kerb and channel have subsided along the length of street and holds water in many locations. The kerb and channel require reconstruction and new drainage installed.

Works involve kerb and channel replacement, installation of new drainage and full width rehabilitation of road pavement and asphalt re-sheet to current standards.

Total cost of proposed project is $510,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.