- Funding program Roads to Recovery Program
- Status Completed
- Transport mode Road
- Expected start/finish Aug 2021 - Mar 2022
- Estimated project cost $778,296
- Australian Government contribution $400,000
- Local Council/Shire Brimbank City Council
- State VIC
Project description
The existing road pavement exhibits oxidation and areas of significant cracking, loss of aggregate and longitudinal roughness. In addition, significant lengths of concrete kerbing is in a poor condition.The project includes the following major aspects - Rehabilitation of 380 metres of existing road pavement and resurfacing with asphalt, reconstruction of 915 metres of existing kerb and channel, reconstruction of existing vehicle crossings where required, reconstruction of all damaged footpath, construction of 105 metres of underground drainage.
Total cost of proposed project is $778,296
Project last updated:
Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.