• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2021 - May 2022
  • Estimated project cost $540,107
  • Australian Government contribution $190,107
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The road has potholes and cracking and sections with poor crossfalls that cause water to pool on the surface.

Between Meerup Road and Mill No. 1 Road, reconstruct the road with suitable gravel including boxing out areas where the sub-grade is substandard. Construct a 8 metre wide pavement and place a 6 metre wide spray seal. For 1000 metres south of Mill No. 1 Road place a second coat spray seal.

Total cost of proposed project is $540,107

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.