• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2021 - Apr 2022
  • Estimated project cost $123,568
  • Australian Government contribution $123,568
  • Local Council/Shire The Barossa Council
  • State SA

Project description

This section of road is a sealed road at the end of its useful life with identified safety issues, including potholes, edge break reducing road width and localised road pavement failure.

40mm AC10-R30 asphalt overlay (plane and reinstate) 40 metres at a width of 7 metres, 14/7 spray seal 1034 at a width of 7 meter as part of Councils Reseal Program to rehabilitate the surface and extend seal life

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.