• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2022 - Apr 2022
  • Estimated project cost $103,350
  • Australian Government contribution $21,882
  • State SA

Project description

This access road was used to access the old Yalata Roadhouse which was closed in early 2000s and the building condemned. Since then the access road had not maintained resulting in poor surface and water drainage.

We are proposing to have the access road levelled, with new road base rubble, fulling in the number of large potholes and create water coverts directing water to the existing drainage location at either side of the site.

Total cost of proposed project is $103,350

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.