• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2022 - Oct 2023
  • Estimated project cost $482,611
  • Australian Government contribution $250,000
  • Local Council/Shire Corporation of the City of Campbelltown
  • State SA

Project description

To address the structural integrity of the road pavement due to soil movement from very reactive soil. This road has a severe environmental deformation and cracking with moderate load induce cracking. Surface texture has a severe defect. Council's Pavement Management System has indicated that this road is warranted for total road reconstruction.

The work will involve a full road reconstruction by total excavation of road base and replacement with a deeper granular pavement to ensure the structure and integrity of the road from possible future soil movement. The works include replacing existing kerbs, driveway, traffic control and improving the drainage system. The road pavement being treated is 74m in length and 7.2m in width.

Total cost of proposed project is $482,611

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.