• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2022 - Jun 2023
  • Estimated project cost $286,138
  • Australian Government contribution $286,138
  • Local Council/Shire Sunshine Coast Regional Council
  • State QLD

Project description

The proposed section has the following defects: significant crocodile cracking, large depressions and/or potholes. The existing surface is old and oxidised. There are moderate failures in both the surface and pavement structure.

Asphalt Resurfacing: Patch pavement failures; profile edges to key-in with the concrete kerb and channel; waterproofing and crack alleviation bitumen sprayed seal; and 35mm thick dense graded asphalt overlay

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.