• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2023 - Dec 2023
  • Estimated project cost $421,533
  • Australian Government contribution $421,533
  • State VIC

Project description

The roadway is a collector road that carries significant volumes of through and local traffic. The existing sealed road has deteriorated significantly, with cracking, potholes and surface deformations. Rehabilitation of the road will improve the safety and reduce ongoing maintenance costs.

Approximately 360m of road is to be foam-bitumen stabilised and approximately 100m of kerb and channel is to be installed.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.