• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jul 2023 - Oct 2023
  • Estimated project cost $18,091
  • Australian Government contribution $18,091
  • Local Council/Shire Shire of Wandering
  • State WA

Project description

Insufficient culvert widths and table drain structure resulting in narrow passes with water egress on road shoulders causing hazards.

Installed additional culvert at straight line kilometre 5.23 to increase reduce water seeping onto left hand side of road due to a high water table and grade shoulder back slope to establish structured table drains. KUBBINE-We are upgrading the size of some culverts @ SLK0.46 from a 375mm to 400mm & 1.26 & 1.62 & 2.10-upgrade from 375mm to 400mm & 2.89 & 3.15 -upgrade from 375mm to 400mm &3.29 &4.47 & 4.81 & 4.91 & 5.39 & 5.76 KUBBINE (new Culvert) At SLK 3.54 We will be installing a new culvert as this section of road floods on a regular basis this will improvements to drainage will assist with lowering of water table which will complement the revegetation of suitable plant species. Remove cap rock in road and gravel resheet to improve road safety for heavy vehicles. Due to lack of gravel on the road there is a high requirement for maintenance due to potholing of the natural ground surface.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.