• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Sep 2024 - May 2025
  • Estimated project cost $60,311
  • Australian Government contribution $60,311
  • Local Council/Shire Shire of Morawa
  • State WA

Project description

Koolanooka South Road provides a connection to the south of the shire and continues into the Shire of Perenjori, currently this section of road is constructed in natural materials and becomes extremely slippery when wet. Widening and improving surface rideability will provide a suitable and safe linkage for road users.

Reform sub-grade and gravel re-sheet the road to a thickness of 100 mm with imported materials to provide an 8 metre running surface and an overall width of 10 metres.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.