• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Oct 2024 - Dec 2024
  • Estimated project cost $457,971
  • Australian Government contribution $339,922
  • Local Council/Shire Shire of Yilgarn
  • State WA

Project description

The existing road surface is made up principally of loose sand and clay based material that is slippery when wet.

In an effort to rectify this problem, it is proposed to carry out reconstruction of the existing road surface to upgrade to an eight metre bitumen prime seal standard. This work involves importing of gravel from designated gravel pits and improving the road surface drainage along with water binding gravel road pavement and laying of a eight metre bitumen prime seal. Project Length - one point two kilometres. Additional funding sourced from allocated Municipal funds.

Total cost of proposed project is $457,971

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.