• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Apr 2025 - Jun 2025
  • Estimated project cost $630,000
  • Australian Government contribution $550,804
  • Local Council/Shire City of Glen Eira
  • State VIC

Project description

About 550 m long concrete kerb & channel and 2400 sqm of roads are dilapidated condition. The roads have deteriorated over the years and uneven, showing signs of failures. Vehicle crossovers damaged as well as some scraping of road pavement. There is inadequate underground drainage system in Lawrance Street to drain the stormwater discharge from properties and road surface runoff to underground pits and pipes.

The work involves installing new kerb and channels, reconstructing failed pavement sections, installing underground drains, filling drainage trenches and constructing pavements, providing adequate drainage to the street and asphalt surfacing. This is a joint project, Glen Eira City Council contributing $79,196 of the total project cost.

Total cost of proposed project is $630,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.