• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2025 - Jun 2025
  • Estimated project cost $54,501
  • Australian Government contribution $46,716
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing seal is in very poor condition with many potholes and a rough and uneven surface due to tree roots; the kerbing is broken, uneven and does not exist in some sections.

Excavate and remove the tree roots that are causing the unevenness in the road surface, remove the existing kerbing, place an asphalt overlay on the existing surface then place new kerbing along the road. The Shire of Manjimup is contributing $10,000 to this project.

Total cost of proposed project is $54,501

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.