• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Jan 2025 - Jun 2025
  • Estimated project cost $458,287
  • Australian Government contribution $458,287
  • State WA

Project description

The 46 year old road seal and kerb is in a very poor condition being severely worn. The road has extensive cracking, stripping, edge break, potholes and patch repairs. The drainage is also in a very poor condition. The pipe capacity is too small causing localised flooding and property damage. There are blockages causes by root intrusion through the old butt joined pipes.

The road will be asphalt overlayed and the old kerb will be replaced. The existing drainage pits and pipes will be replaced. The cul-de-sac at will be reconstructed and will provide residents with a larger turning circle and improved drainage.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.