• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Dec 2024 - Mar 2025
  • Estimated project cost $1,421,817
  • Australian Government contribution $1,197,322
  • Local Council/Shire Wyndham City Council
  • State VIC

Project description

• The road pavement has exceeded its design life and begun to show signs of failure, that are beyond the scope of preventive maintenance. • The existing kerb and channel has been subjected to environmental movement and is holding water in a number of locations. • Investigations have also highlighted locations of failed sections of underground drainage that requires reconstruction and remediation. • Pedestrian safety concerns around the existing configuration of the school crossing along Danube Drive.

• Reconstruction of the road pavement • Reconstruction of the kerb and channel on both sides of the road • Reconstruction of vehicle crossings • Reconstruction footpaths • Reconstruction of nature strips • Various methods of drainage remediation • Construction of a Raised Safety Platform at the school crossing to improve safety. The balance of the funding for this project is being sourced form Council Cash, from the 2024/25 Road Reconstruction Program, which has been incorporated into Council’s Annual Plan and Budget for 2024/25 as approved and adopted by Council on 25th June 2024.

Total cost of proposed project is $1,421,817

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.