• Funding program Roads to Recovery Program
  • Status Underway
  • Transport mode Road
  • Expected start/finish Jan 2025 - Mar 2026
  • Estimated project cost $850,000
  • Australian Government contribution $425,000
  • Local Council/Shire Wattle Range Council
  • State SA

Project description

The current road shows structural failure with significant rutting and cracking, indicating problems with both the pavement and underlying sub-grade. Reconstruction, rather than patching, is necessary to ensure a uniform treatment and maintain good ride quality. The proposed project aims to address major deficiencies by reconstructing the failed section of Tower Road and widening it to close the dimensional gap. The widening will bring the road up to Austroads design standards, improving the width to 7.2 metres with a 1.0 metre shoulder (0.5 metres sealed) and an edge line. This project includes full pavement reconstruction of a 1.7 km section, enhancing the road's safety and functionality. Balance of project costs being covered by Wattle Range Council's own funding and Local Roads Community Infrastructure Program ($362,993).

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.