• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2025 - Jun 2025
  • Estimated project cost $568,920
  • Australian Government contribution $386,410
  • Local Council/Shire Shire of Shark Bay
  • State WA

Project description

Durlacher Street bitumen seal has numerous longitudinal and crocodile cracking with evidence of some stripping. Kerbs are in an extremely poor condition with multiple cracks and defects. Footpath is not suitable for purpose as it has a very poor and uneven surface condition and not wide enough for dual use purposes.

Remove footpath and kerbs. Profile existing seal. Reinstate kerbs and install dual use footpath. Reseal along Durlacher Street with asphalt. Replace signage as required. Balance of project costs being provided by Local Roads and Community Infrastructure Program.

Total cost of proposed project is $568,920

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.