• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Mar 2025 - Mar 2025
  • Estimated project cost $297,927
  • Australian Government contribution $297,927
  • Local Council/Shire Shire of Boyup Brook
  • State WA

Project description

Recent assessments have indicated significant deterioration of the gravel materials, which has resulted in exceptionally low levels. This degradation is contributing to slippage on the road surface, creating a hazardous environment for vehicles.

This proposal is for reshaping and re-sheeting a 3,000-metre long roadway that is 10 metres wide. The work will involve the application of a 150 mm depth of gravel to enhance the roadway's structural integrity and safety.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.