• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Dec 2024 - Feb 2025
  • Estimated project cost $331,234
  • Australian Government contribution $71,903
  • Local Council/Shire Melbourne City Council (City of Melbourne)
  • State VIC

Project description

Wide ranging cracking (longitudinal, transverse), numerous patches and depressions including the roadway channel, rutting along wheel paths at approach to intersections and fatigue appearance and pavement failing in sections.

Profile: 50 mm (full width) and Resurface: Wearing Course - full width with 50 mm size 10 mm aggregate Hot Mix Asphalt (HMA) including lift and reset wide pitcher channel in sections. Source of joint funding: The City of Melbourne will fund the balance between the nominated Cost to RTR allocation and the Total Project Cost from its Roadway Renewal Budget.

Total cost of proposed project is $331,234

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.