• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Jul 2025 - Dec 2025
  • Estimated project cost $77,460
  • Australian Government contribution $77,460
  • Local Council/Shire Coolamon Shire Council
  • State NSW

Project description

Surrounding urban area has been developed with kerb and gutter provided to address drainage issues and this is the remaining section to be K&G. Will eliminate pooling of water, erosion and subsequent deterioration of road.

Existing table drain will be excavated, gravel foundations developed, K&G installed, nature strip backfilled, seal extended between K&G and existing road. Existing power poles will also be relocated out of kerb alignment to behind kerb.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.