• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish Feb 2025 - Mar 2025
  • Estimated project cost $38,533
  • Australian Government contribution $38,533
  • Local Council/Shire Shire of Boddington
  • State WA

Project description

The existing pavement surface is showing signs of wear and routing. The road is under the care of Main Roads WA only for the width of the two trafficable lanes. Main Roads WA has already repaired the damaged pavement areas and is going to reseal the entire section of road going through town. Main Roads has invited the Shire of Boddington to take advantage of the mobilisation of all the equipment to extend the work area to the parallel parking areas that are situated on both side of the road. These on-road parking areas are under the care of the Shire of Boddington.

For this project it is proposed to do a micro surfacing (reseal) on the parking areas under the care of Shire of Boddington at the same time as the work executed by Main Roads WA. This will enhance the longevity of the already ageing seal and preserve the road pavement. Line marking will follow the work to ensure a clear delineation of traffic and parking lanes.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.