• Funding program Roads to Recovery Program
  • Status Completed
  • Transport mode Road
  • Expected start/finish May 2025 - Jun 2025
  • Estimated project cost $280,809
  • Australian Government contribution $249,749
  • State NSW

Project description

The existing surface is affected by cracking, deformation and pavement failures. There are number of old patches and utility trenches, which makes the road surface rough.

The proposed treatment includes reconstruction of existing road pavement with asphalt and full resurfacing of the road. Length = 350 m; Width = 7.2 m; Area = 2520 m2. The project will be jointly funded by Roads to Recovery and City of Parramatta Council.

Total cost of proposed project is $280,809

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.