• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Sep 2025 - Jun 2026
  • Estimated project cost $473,890
  • Australian Government contribution $350,000
  • Local Council/Shire City of Darebin
  • State VIC

Project description

The road seal has reached the end of its service life and exhibits signs of pavement distress. The road camber has deteriorated, resulting in water ponding at several locations. Kerbs on both sides are damaged, affecting the effective flow of stormwater along the gutters.

Rehabilitate the road pavement to enhance structural integrity and surface profile. Apply a new asphalt seal and replace kerbs on both sides with new ones. Upgrade drainage infrastructure by installing additional pits and connecting them to the existing stormwater pipeline. the additional funding of $123,890 will be sourced out from council own funds.

Total cost of proposed project is $473,890

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.