• Funding program Roads to Recovery Program
  • Status Not started
  • Transport mode Road
  • Expected start/finish Jan 2026 - Apr 2026
  • Estimated project cost $475,000
  • Australian Government contribution $381,096
  • State NSW

Project description

Problem being addressed is a culvert that has been partially washed out, doesn't meet required stormwater capacity and flood immunity for local access requirements. Work proposed is to install an increased size pipe and new headwalls, add a new flow resistant concrete deck and scour protection. Proposal is to replace the current 450 RCP pipe and two temporary PVC pipes with a new 1200 culvert installation. Will raise the current road surface to reduce saturation in flood events while the water dissipates.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.