• Funding program Roads to Recovery Program
  • Status Underway
  • Transport mode Road
  • Expected start/finish Jul 2025 - Jun 2026
  • Estimated project cost $375,000
  • Australian Government contribution $250,000
  • Local Council/Shire City of Victor Harbor
  • State SA

Project description

Range Road requires deep lift pavement resealing and shoulder widening due to its narrow lane width, failed pavement, and deteriorated shoulder conditions. As a critical freight route in the region, the road experiences significant interaction between heavy vehicles and commuter traffic within a 100 km/h speed zone. The existing surface shows heavy rutting and poor drainage, compromising safety and usability. Upgrading the road and shoulders will improve safety for all users by addressing structural failures and accommodating mixed vehicle types more effectively Deep lift patching will be carried out based on the road’s condition at the time of construction, with proposed 40mm asphalt patches covering the full 7-metre road width (or 3.5 metres for single-lane sections). All treated areas will include a 1-metre-wide sealed shoulder to enhance road safety and functionality. Prior to works, roadside vegetation management and drainage maintenance will be undertaken. Following sealing, line marking will be reinstated, roadside markers will be relocated or replaced, and signage will be upgraded where necessary. Council/s contribution: $125,000.00

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.