• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Dec 2025 - Dec 2025
  • Estimated project cost $66,408
  • Australian Government contribution $66,408
  • Local Council/Shire City of Port Phillip
  • State VIC

Project description

Deformed asphalt surface has been identified through road inspections. The pavement surface has changed from the originally constructed profile which may directly influence the riding quality, water ponding and skid resistance. Resurfacing this road will improve road performance with regards to strength and riding quality.

40 mm thick size 14 asphalt - Type H wearing course along 190 metre and 10 metre width (Area = 1900 m2).

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.