• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Sep 2025 - Dec 2025
  • Estimated project cost $315,000
  • Australian Government contribution $315,000
  • State NSW

Project description

Rawsonville Road currently has difficulty accommodating increased traffic loadings and is subsequently in poor condition. Rawsonville Road also has height issues contributing to poor drainage, ponding, and localised flooding. The road requires additional height to ensure adequate drainage.

The proposed work includes strengthening the existing road pavement with 100mm gravel overlay, and a sealing with a two-coat seal. The length of the road being treated is 1.8km long and 6m wide.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.