• Funding program Roads to Recovery Program
  • Status In planning
  • Transport mode Road
  • Expected start/finish Sep 2025 - Dec 2025
  • Estimated project cost $750,000
  • Australian Government contribution $200,000
  • Local Council/Shire Shire of Manjimup
  • State WA

Project description

The existing road is in poor condition with subgrade failures in a umber of locations and the seal is generally less than 6.0 metres wide with narrow or no shoulders in place.

Replace or extend culverts as required. Box out failing sections of the road and rebuild with suitable sub-grade, rip the existing surface and approximately 100 milimetres of pavement then prepare this surface ready for new gravel to be imported, spread and compacted to form a 9 metre wide pavement as per the design. Place a 2 coat spray seal, kerbing and sub-surface drains where required by the design. Project additional funding sources are Regional Road Group ($500,000) and Shire of Manjimup ($50,000), with Roads to Recovery ($200,000).

Total cost of proposed project is $750,000

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.