• Funding program Roads to Recovery Program
  • Status Underway
  • Transport mode Road
  • Expected start/finish Aug 2025 - Dec 2025
  • Estimated project cost $148,575
  • Australian Government contribution $148,575
  • Local Council/Shire Leeton Shire Council
  • State NSW

Project description

Asset maintenance and ride quality, along with pavement strengtheing for heavy vehicles are the contributing factors for the inclusion of this road into the R2R program. the existing pavement is in poor condition from heavy vehicles traffic and requires continual maintenence repairs. Works will include the full pavement rehabilitation works along the length of the road, subgrade stabilisation where required. works will be completed with a 2 coat bitumen seal to 8m width and linemarked.

Project last updated:

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.